Alftek links coordinated BIM models to the construction programme and to cost. 4D construction simulations show sequencing, phasing and logistics before anyone breaks ground. 5D cost-integrated models give you quantity take-off, BOQ generation and cost tracking that keep pace with the design.
Get a Free 4D/5D QuoteMost construction risk in Qatar is time and money, not geometry. Projects run to fixed opening dates, sites are often tight and live, and many trades share the same floors at once. A 3D model shows what is being built. It does not show when each part gets built, in what order, or what it costs.
4D and 5D BIM answer those two questions from the same coordinated model. Alftek has been headquartered at Alfardan Centre on Grand Hamad Street in Doha since 2018. We deliver construction sequence simulations and model-based quantities as part of the same lifecycle service, from design through construction to as-built.
Each service builds on a coordinated model. If the models are not coordinated yet, that comes first.
Model elements linked to programme activities, so the build sequence plays back over time and gaps or overlaps show up on screen.
Phased handovers, crane and laydown areas, access routes and temporary works shown against the programme, stage by stage.
Quantities measured straight from model elements, so they can be re-run whenever the design changes rather than re-measured by hand.
Model quantities structured into a bill of quantities, then tracked as the design develops through construction.
Architectural, structural and MEP models coordinated and clash-checked, so 4D and 5D work from reliable geometry.
Explore Clash Detection →For renovation and extension work, scan-to-BIM models give phasing and quantities an accurate as-built starting point.
Explore Scan to BIM →A 4D simulation is only as useful as the link between the model and the programme. Most of the work, and most of the value, is in structuring both so they fit together.
Tender presentation, logistics planning, phased handover and trade sequencing each need a different level of detail. Settling the purpose first decides how finely the model is split and how many programme activities it is linked to. It stops the simulation turning into a detailed animation nobody uses.
The inputs are a coordinated model and the construction programme, typically exported from Primavera P6 or Microsoft Project. Any site logistics plan, phasing constraints or access restrictions are gathered at the same time.
Programmes are organised by zone, level and trade. Models are organised by discipline and element type. Elements are grouped and tagged by zone and level (a slab pour, say, or a core wall lift) so each can be linked to the activity that builds it.
Each element group is linked to its programme activity, with temporary works and site set-up added where they affect the sequence. Unlinked elements and empty activities are listed, because both usually point to a gap in either the model or the programme.
The simulation is played back with the planning and site teams. Typical findings include work shown finishing before the work it depends on, trades stacked in the same area at once, and access routes blocked by an earlier stage. The programme or the plan is adjusted and the simulation re-run.
When the programme is re-baselined or the design changes, the links are updated rather than rebuilt. During construction, planned progress can be compared with actual progress to show where the project is slipping.
Measuring a set of drawings by hand takes days, and it has to be done again every time the design changes. With model-based take-off, the measurement is set up once. After a design change, the take-off is re-run and the quantities that moved are easy to see.
| Stage | Typical model detail | What 5D supports |
|---|---|---|
| Concept & early design | LOD 100–200: massing, areas, main systems | Early cost planning, option comparison, area-based checks against budget |
| Developed & tender design | LOD 300: elements modelled and classified | Quantities for tender BOQs, checking contractor pricing, value engineering |
| Construction | LOD 400: construction-ready models | BOQ updates, change and variation quantities, cost tracking against budget |
| As-built | LOD 500: as-built models | Final quantities and asset data handed over for operation |
Both come down to finding a problem while it is still cheap to fix. A sequencing clash found in a simulation means editing the programme. Found on site, it means idle crews, re-planning and a claim. A cost overrun spotted at design stage is a value-engineering decision. Spotted at final account, it is a dispute.
4D and 5D add the most value when the model is coordinated and kept current. A simulation or take-off built on an uncoordinated model repeats its errors. That is why we coordinate disciplines and resolve clashes before linking time or cost to the model.
One team for the model, the coordination, the sequence and the quantities, so nothing is lost in handoffs.
Design models, coordination, construction sequence simulation, BOQ, as-built and FM handover from the same team.
Explore BIM Services in Qatar →Structured information management, so model versions, programme links and quantities stay traceable.
Explore ISO 19650 →Architectural, structural and MEP modeling in Revit, so gaps found in 4D or 5D can be fixed in the model directly.
Explore BIM Modeling →Metro & rail, aviation, healthcare, hospitality, high-rise, education and infrastructure.
4D BIM links the elements of a 3D model to the activities in the construction programme, so the build sequence can be played back over time. It is used to check phasing, site logistics and trade sequencing before work starts on site.
5D BIM adds cost to the model. Quantities are extracted directly from model elements, structured into a bill of quantities and priced, so the cost picture updates when the design changes instead of being re-measured by hand.
Yes. Alftek is headquartered in Doha and delivers 4D construction simulations covering sequencing, phasing and logistics, and 5D cost-integrated models covering quantity take-off, BOQ generation and cost tracking through design and construction.
A coordinated 3D model, or the discipline models we can coordinate first, and the construction programme, typically exported from Primavera P6 or Microsoft Project. A site logistics plan and any phasing constraints make the simulation considerably more useful.
No. Model-based take-off is only as complete as the model, and items such as preliminaries, temporary works and elements not modelled still need a quantity surveyor's judgement. 5D BIM makes measurement faster and repeatable and gives the cost consultant a reliable quantity base to work from.
It depends on the estimate. Early cost planning can work from LOD 100 to 200 massing and areas. A tender-stage or construction-stage BOQ needs elements modelled and classified at around LOD 300 to 400, with consistent naming and parameters, so quantities can be grouped the way the bill is structured.
A 4D model can show the planned sequence against what was actually built, which makes delay events easier to explain visually. It supports the analysis a planning or claims specialist carries out; it does not replace that analysis.
Alftek is headquartered at Alfardan Centre, 2nd Floor, Grand Hamad Street, Doha, Qatar, and delivers BIM services nationwide including Doha, Lusail, Al Khor and Al Wakrah.
Talk to Alftek's Doha-based BIM team about 4D sequencing and 5D quantities for your project. Get a free consultation and a tailored scope and quote.