As-Built Documentation · Doha, Qatar

As-Built Drawings Services in Qatar

Alftek turns site mark-ups and verified site data into complete as-built drawings, updates BIM models to LOD 500 to reflect as-installed conditions, and assembles the full documentation package your client needs at handover.

Get a Free As-Built Quote

The record of what was actually built

No building is constructed exactly as drawn. Services are rerouted around structure, openings move, equipment is substituted and approved changes pile up over months on site. By practical completion, the issued construction drawings describe a building that does not quite exist.

As-built drawings close that gap. They are what the owner, the operator and the next designer will rely on for years, so they need to show the installed reality, not the design intent. Alftek has been headquartered at Alfardan Centre on Grand Hamad Street in Doha since 2018. As-built drawing production and as-built model updates are part of the same lifecycle service we deliver from design through construction.

2018
Delivering in Qatar since
2D
As-built drawings
LOD 500
As-built record models
ISO 19650
Aligned workflows

As-built services we deliver in Qatar

From a single discipline's drawing set to a complete handover package for the whole project.

2D As-Built Drawings

Complete as-built drawing production from site mark-ups and verified data, across architectural, structural and MEP disciplines.

As-Built BIM Model Updates

Construction models updated to LOD 500, so the record model reflects as-installed conditions and matches the drawings.

Full Documentation Package

Drawings, models and registers organised into one consistent handover package in the formats your client asks for.

COBie & Asset Data

Asset and equipment data structured as COBie for handover into facility management and CAFM systems.

Explore CAFM →

As-Built vs As-Designed

A comparison of what was built against what was designed, useful for final account, snagging and later dispute resolution.

Laser Scan Verification

Where mark-ups are missing or unreliable, laser scanning and point cloud data verify the installed conditions.

Explore Scan to BIM →

How as-built drawings are produced

Drafting is the smaller part of the job. Most of the effort goes into collecting the right records and making sure every change on them is real, approved and drawn once.

Agree the scope and the standard

Which disciplines, which areas, which formats, and what the client's handover requirements and drawing standards say. Settling this first avoids producing a complete set that the client then rejects for layout, naming or content.

Collect the base set and the site records

The base is the latest issued construction and shop drawings, or the construction models. On top of that come the site team's marked-up drawings, approved changes and site instructions. Records are logged against the drawing register so nothing is picked up twice or missed.

Check the mark-ups before drawing them

Mark-ups are often incomplete, unclear or contradict each other between trades. Queries go back to the site team in one register. Areas without reliable records are flagged for verification on site, by survey or laser scanning, rather than guessed.

Update the drawings and the model together

Where the project has a BIM model, changes are made in the model and the drawings are produced from it, so the two stay consistent. Where the project is drawing-based, the 2D set is revised directly and clearly marked as as-built.

Review against the site

The draft set goes back to the site and discipline leads for confirmation. Drawings that change the location of concealed services get particular attention, because those are the ones maintenance teams will rely on most.

Assemble and hand over

Final drawings are issued in DWG and PDF, models in RVT and IFC, with the drawing register and COBie data where required. Handover takes place once the contract administrator has confirmed all contracted works are complete.

As-built deliverables and what they are used for

Every deliverable in the package has a different reader after handover. The format follows the use.

DeliverableTypical formatUsed for
2D as-built drawingsDWG, PDFOperation and maintenance, future alterations, authority and client records
As-built BIM model (LOD 500)RVT, IFCA record model of as-installed conditions for FM, refurbishment and future design
Asset dataCOBieLoading equipment and asset information into FM and CAFM systems
Drawing register & documentation packagePDF, spreadsheetShowing the handover set is complete and traceable to the site records
As-built, not as-designed: a drawing is only as-built if the change on it was verified. Where there is no record for an area, the honest options are to verify it on site or to mark it clearly as not verified. Relabelling the construction set "as-built" without that check creates a record the next team will trust and should not.

Why accurate as-built drawings pay for themselves

The cost of poor as-built records does not show up at handover. It shows up years later, when a maintenance team opens the wrong ceiling, a fit-out designer works from a layout that is out of date, or a renovation has to start with a survey that should not have been needed.

As-built work is easiest when it starts during construction, with mark-ups collected as work is completed, rather than at the end when the people who made the changes have moved on. If you are mid-project, it is worth agreeing the as-built process now.

Why Qatar project teams choose Alftek for as-built drawings

The same team that models, coordinates and produces shop drawings produces the as-built record, so the handover set is consistent with everything issued before it.

Full lifecycle

Design models, coordination, shop drawings, as-built and FM handover from one team.

Explore BIM Services in Qatar →

4D & 5D BIM in Qatar →

ISO 19650 workflows

Structured information management, so as-built changes stay traceable to the records behind them.

Explore ISO 19650 →

Modeling capability

Architectural, structural and MEP modeling in Revit, so as-built changes are made in the model, not only on paper.

Explore BIM Modeling →

Coordinated from the start

Clash-checked construction models mean fewer site changes to record at the end.

Explore Clash Detection →
DohaLusailAl Khor Al WakrahAl RayyanUmm Salal

Frequently asked questions

What are as-built drawings?

As-built drawings record what was actually constructed, including every change made on site after the construction drawings were issued. They replace the design intent with the installed reality, so the owner and the facility management team know where walls, services and equipment really are.

What is the difference between as-built drawings and scan to BIM?

As-built drawings for a new project are produced at the end of construction from the site team's mark-ups and verified site data. Scan to BIM is used when a building already exists and its drawings are missing or unreliable: the building is laser scanned and the model is built from the point cloud. Where site records are incomplete, the two are combined.

Does Alftek provide as-built drawings in Qatar?

Yes. Alftek is headquartered in Doha and produces 2D as-built drawings from site mark-ups and verified data, updates BIM models to LOD 500 to reflect as-installed conditions, and assembles the full as-built documentation package for handover.

What do you need from the site team?

The latest issued construction and shop drawings or models, the marked-up drawings from site, and supporting records such as approved changes and site instructions. Survey data or a laser scan is useful wherever the mark-ups are incomplete or disputed.

What formats are as-built deliverables provided in?

Typically DWG and PDF for drawings, and Revit RVT and IFC for the as-built model. COBie data can be added where the facility management system needs structured asset information.

What does LOD 500 mean?

LOD 500 describes a post-construction record model that has been updated to reflect as-installed conditions. It is a statement about how well the model has been verified against what was built, not about how much geometric detail it contains.

Can as-built drawings be produced after the contractor has left site?

Yes, but the accuracy depends on the records left behind. If mark-ups are missing for some areas, those areas need to be verified on site, by survey or laser scanning, before they can be drawn as built rather than as designed.

Where is Alftek located in Qatar?

Alftek is headquartered at Alfardan Centre, 2nd Floor, Grand Hamad Street, Doha, Qatar, and delivers BIM services nationwide including Doha, Lusail, Al Khor and Al Wakrah.

Hand over a record your client can rely on

Talk to Alftek's Doha-based BIM team about as-built drawings and LOD 500 models for your Qatar project. Get a free consultation and a tailored scope and quote.

Request a Free Quote