Alftek models mechanical, electrical and plumbing systems in Revit for projects across Qatar, routes them to avoid the clashes that cause rework once contractors are on site, coordinates them against the structural and architectural models, and produces the shop drawings, quantities and as-built records the project needs from them.
Get a Free MEP BIM QuoteOn most Qatar projects the mechanical, electrical and plumbing systems are the last discipline to be fixed and the first to be blamed. Ducts, pipes, cable trays and drainage have to find a route through a structure that is already poured and below a ceiling the architect has already set. When the MEP model is produced late, in isolation, or straight from a schematic without coordination, the conflicts surface on site, where moving a duct means cutting an opening, lowering a ceiling or re-routing a run that is already installed.
Alftek's MEP BIM service exists to prevent that. We model the systems to the level of development each stage needs, route them against the real structure and architecture, and federate them with the other disciplines so clashes are resolved on screen. Alftek has been headquartered at Alfardan Centre on Grand Hamad Street in Doha since 2018, and MEP modeling is part of the same full-discipline, lifecycle BIM service we deliver from design through construction and handover.
Each service can run on its own or as part of a full-discipline BIM engagement under a project BIM execution plan.
Mechanical, electrical and plumbing systems modeled and routed in Revit as real, connected systems, built for coordination and quantity extraction rather than drawing production alone.
Explore BIM Modeling in Qatar →Supply, return and exhaust ductwork, chilled water and refrigerant pipework, air-handling units, fan coil units and plant, modeled with the clearances the systems need to be installed and maintained.
Domestic water, drainage and plumbing modeled with the falls and routes resolved against structure, plus fire fighting and other building services where they form part of the project's MEP scope.
Cable trays, trunking, conduit routes, distribution boards, lighting and power layouts modeled and coordinated with the mechanical services competing for the same ceiling zone.
Model federation, clash detection runs between MEP, structure and architecture, and between the MEP services themselves, with resolution reporting in Navisworks, Solibri or Revizto.
Explore Clash Detection in Qatar →Fully coordinated, construction-ready MEP models with shop drawing production for contractor coordination and approvals, so what is drawn is what was coordinated.
Quantity take-off and BOQ generation from the MEP model for duct, pipe, containment and equipment quantities, kept current as the design changes.
Explore 4D & 5D BIM →LOD 500 MEP record models and 2D as-built drawings updated from site mark-ups, with equipment and asset data and COBie prepared for facility management handover.
Explore As-Built Drawings →Level of development is agreed in the BIM execution plan before modeling starts, so that nobody pays for fabrication-level detail at concept stage, and nobody receives a schematic-level model when the contractor needs to install from it.
| Level | What is modeled | Used for |
|---|---|---|
| LOD 300 · Detail design | Ductwork, pipework, drainage, containment, plant and equipment at their designed sizes, levels and routes, with system type and service data, in the ceiling and riser zones agreed with architecture and structure | Design coordination, clash detection against structure and architecture, tender quantities |
| LOD 400 · Construction | The coordinated services developed to construction-ready detail, with fittings, supports, access and maintenance clearances, and the openings and penetrations through structure resolved with the other disciplines | Shop drawing production, contractor coordination and approvals, construction quantities |
| LOD 500 · As-built | The construction model updated from site mark-ups and verified data to reflect as-installed routes and equipment, with asset data attached | Handover record, COBie and facility management, future alterations and plant replacement |
Alftek follows the same structured six-step delivery process on every engagement, so a Qatar project team knows what happens when, and what has to be agreed before modeling starts.
Scope, level of development, drawing standards, naming, file formats and the coordination schedule are set out in the BIM execution plan, aligned to ISO 19650 where the client or consultant requires it. For MEP that includes which systems are modeled, the ceiling and riser zones each service is allocated, and who owns the openings and penetrations through structure.
The MEP engineer's drawings, schematics, equipment schedules and specifications are logged against a register. Inconsistencies between plans, schematics and schedules are raised as queries before they are modeled.
Mechanical, electrical and plumbing systems are modeled in Revit on the shared project grid and levels as connected systems, with sizes, service types and equipment data populated so the model schedules and quantifies correctly from the start. Routes are set against the real structural and architectural models, not a blank floor plate.
The MEP model is federated with the other disciplines and clash detection runs in Navisworks, Solibri or Revizto according to the project's clash matrix: structure against MEP, MEP against MEP, MEP against ceilings and walls, and plant against access zones. Clashes are grouped by root cause, assigned and tracked to closure.
Progress is reported against the programme with dashboards and regular reporting, and a QA/QC check runs after every discipline and system before anything is issued. Shop drawings and quantities are produced from the checked model, not drawn separately.
At the end of construction the MEP model is updated to LOD 500 from site mark-ups and verified data, equipment and asset data is attached, and the model is issued with the as-built drawings and COBie data in the formats the client's handover requirements call for, typically RVT, IFC, DWG and PDF.
Most of the clashes on a typical Qatar project involve a service. The structure and the architecture are fixed early; the ducts, pipes and trays have to be threaded through what is left. That is why the MEP model has to be routed against real geometry and tested on every coordination cycle, not drawn once from a schematic.
This is why Alftek delivers MEP modeling as part of full-discipline BIM rather than as a standalone drafting service: the value is in the coordination, and coordination needs all three disciplines in one federated model.
Alftek models in the platforms Qatar consultants and contractors already work in, so deliverables drop straight into the project's existing workflow.
The primary modeling platform for architectural, structural and MEP work, including mechanical, electrical and plumbing systems, equipment and custom MEP families.
Model federation, clash detection runs and issue tracking between MEP, structure and architecture, with issues exchanged in BCF.
2D MEP drawing production, and site, road and dry and wet utility modeling alongside the building services.
Common data environment for sharing MEP models, drawings and coordination issues with the wider project team.
Alftek has modeled across the building and infrastructure types that make up much of Qatar's construction pipeline, from stadia and metro infrastructure to healthcare, aviation, high-rise and government work, where the density of services is highest and the cost of an uncoordinated run is greatest.
High-rise residential and hospitality, healthcare and medical, education, and mixed-use commercial developments.
Metro and railway, aviation and airports, roads and infrastructure, and dry and wet utilities.
Sports facilities and stadia, government and defence, and theme parks.
More than 50 BIM workstations across Alftek's offices in Qatar and India, built for intensive modeling, coordination and point cloud workloads.
See our projects →The same Doha-based team that models the services coordinates them, produces the drawings and quantities from them, and updates them to as-built at the end, so nothing is lost between stages.
MEP, structure and architecture from one team, coordinated in one federated model.
Explore BIM Services in Qatar →Structured information management, so every MEP change is traceable to the design information behind it.
Explore ISO 19650 →Clash detection and resolution reporting are part of the modeling service, not an extra.
Explore Clash Detection →LOD 300 design models through LOD 400 construction models to LOD 500 as-built records, with asset data ready for CAFM.
Explore CAFM →MEP BIM is a 3D model of a building's mechanical, electrical and plumbing systems, such as ductwork, pipework, drainage, cable trays, containment, plant and equipment, carrying the data the project needs: sizes, levels, routes, system types and quantities. It is coordinated with the structural and architectural models so that conflicts are found on screen rather than on site.
Yes. Alftek is headquartered in Doha and models mechanical, electrical and plumbing systems in Revit for projects across Qatar, routes them to avoid the clashes that cause rework on site, coordinates them against structure and architecture, and produces shop drawings, quantities and as-built record models from them.
The MEP BIM service on this page models, routes and coordinates the systems designed by the project's MEP engineer, who remains responsible for the design, sizing and specification. Alftek also offers design consultancy across architecture, structure and MEP as a separate service.
All MEP services on the project: HVAC ductwork, chilled water and refrigerant pipework and air-handling equipment; domestic water, drainage and plumbing; electrical containment, cable trays, distribution and lighting; and fire fighting and other building services where they form part of the project's MEP scope, as well as dry and wet utilities on infrastructure work.
LOD 300 for coordinated detail design models, LOD 400 for construction-ready models with shop drawing production, and LOD 500 for post-construction record models updated to reflect as-installed conditions. The level is agreed in the BIM execution plan at the start.
Yes. Many Qatar projects still issue MEP design as 2D drawings and schematics. Alftek converts the drawings, schedules and equipment lists into a coordinated Revit MEP model, and raises any inconsistencies between plans, schematics and schedules back to the engineer in a query register.
Yes, through scan to BIM. The existing services are laser scanned with a FARO Focus scanner and the point cloud is converted into a Revit model of the architectural, structural and MEP elements, which is the usual route for renovation, retrofit and plant-replacement work where the original MEP drawings are missing or unreliable.
Alftek is headquartered at Alfardan Centre, 2nd Floor, Grand Hamad Street, Doha, Qatar, and delivers BIM services nationwide including Doha, Lusail, Al Khor and Al Wakrah.
Talk to Alftek's Doha-based BIM team about MEP modeling and coordination for your Qatar project. Get a free consultation and a tailored scope and quote.
Request a Free Quote